Dr. Jon E. Mendelsohn, Medical Director of Advanced Cosmetic Surgery & Laser Center, stands inside the newly framed “Studio A” 900 square foot production facility at 3805 Edwards Road inside Rookwood Office Tower. The studio will be used for commercial production and live streaming of both cosmetic and surgical procedures and also for the taping of the “True Selfies.” Premier Restoration and Construction Services is the general contractor and Nimbus Nine Interior Design is the interior design firm, and JYS Productions is the videography team, with the budget set at $200,000. Anticipated completion date is March 2019.
http://www.livingmagazines.com/2019/02/dr-jon-mendelsohn-builds-new-900.html
Recent Comments